Abergeldie was appointed to design and construct a single vertical ventilation shaft of 390m depth and 5.5m finished and hydrostatically lined diameter to serve coal mine workings at two levels.

Client

Vale Australia

Year

2014

Region

NSW

Share

m
Deep Shaft
m
Finished Diameter Shaft
Serves Two Mine Working Levels