Projects Archives - Abergeldie Complex Infrastructure https://abergeldie.com/category/projects/ Civil Engineering, Civil Contractor, Bridge Construction, Tunneling Companies Mon, 05 Jun 2023 04:51:35 +0000 en-AU hourly 1 https://wordpress.org/?v=6.1.3 https://abergeldie.com/wp-content/uploads/2022/04/cropped-favicon-32x32.png Projects Archives - Abergeldie Complex Infrastructure https://abergeldie.com/category/projects/ 32 32 Greater Western Water Main Renewals https://abergeldie.com/projects/greater-western-water-main-renewals/ Wed, 03 May 2023 23:38:41 +0000 https://abergeldie.com/?page_id=12386 Our projects Providing the Complex Infrastructure Needed to Build Better Communities featured projects Greater Western Water Main Renewals Abergeldie DKM has been working with Greater Western Water since 2015 on their Mains Renewal Programs to provide a reliable water supply. Great Western Water currently services over 3,700 km2  from Melbourne’s city centre to Werribee in…

The post Greater Western Water Main Renewals appeared first on Abergeldie Complex Infrastructure.

]]>

Our projects

Providing the Complex Infrastructure Needed to Build Better Communities

Greater Western Water Main Renewals

Abergeldie DKM has been working with Greater Western Water since 2015 on their Mains Renewal Programs to provide a reliable water supply. Great Western Water currently services over 3,700 kmfrom Melbourne’s city centre to Werribee in the southwest, Bacchus Marsh in the west and Lancefield in the north.

Client

Great Wester Water

Year

In Progress

Region

VIC

Share

Wtaer main upgrade projects completed under the current contract
km
Renewed pipeline installed under the current contract
Year client relationship
RELATED PROJECTS
YVW Photo 6 1200 x 900 px
Yarra Valley Water Mains Renewals
Downes Lane, Geelong_1200 x 900
Barwon Water Mains Renewal Program
Balickera Tunnel Entrance
Balickera Tunnel Remediation
Cessnock WWTW Upgrade Project Aerial Photo
Cessnock Wastewater Treatment Works Upgrade
Caboolture South Recycled Water Disinfection Facility
Caboolture South Recycled Water Disinfection Facility

The post Greater Western Water Main Renewals appeared first on Abergeldie Complex Infrastructure.

]]>
Yarra Valley Water Mains Renewals https://abergeldie.com/projects/yarra-valley-water-mains-renewals/ Tue, 11 Apr 2023 23:02:44 +0000 https://abergeldie.com/?page_id=12380 Our projects Providing the Complex Infrastructure Needed to Build Better Communities featured projects Yarra Valley Water Mains Renewals Abergeldie DKM has been working with Yarra Valley Water for 23 years on their water mains renewal programs to ensure reliable water supply to over two million people and over 58,000 businesses in the northern and eastern…

The post Yarra Valley Water Mains Renewals appeared first on Abergeldie Complex Infrastructure.

]]>

Our projects

Providing the Complex Infrastructure Needed to Build Better Communities

Yarra Valley Water Mains Renewals

Abergeldie DKM has been working with Yarra Valley Water for 23 years on their water mains renewal programs to ensure reliable water supply to over two million people and over 58,000 businesses in the northern and eastern suburbs of Melbourne.

During this time Abergeldie DKM has established a strong, trusted and collaborative partnership with Yarra Valley Water and has been involved in early contractor involvements, design, and construction. Abergeldie DKM has also provided long-term service with input into future capital and maintenance works planning.

 

 

Client

Yarra Valley Water

Year

In Progress

Region

VIC

Share

Water Main Upgrade projects completed under the current contract
km
Renewed pipeline Installed under the current contract
Year client relationship
RELATED PROJECTS
Griffith Street Maddingley 2
Greater Western Water Main Renewals
Downes Lane, Geelong_1200 x 900
Barwon Water Mains Renewal Program
Balickera Tunnel Entrance
Balickera Tunnel Remediation
Cessnock WWTW Upgrade Project Aerial Photo
Cessnock Wastewater Treatment Works Upgrade
Caboolture South Recycled Water Disinfection Facility
Caboolture South Recycled Water Disinfection Facility

The post Yarra Valley Water Mains Renewals appeared first on Abergeldie Complex Infrastructure.

]]>
Barwon Water Mains Renewal Program https://abergeldie.com/projects/barwon-water-mains-renewal-program/ Tue, 11 Apr 2023 03:28:52 +0000 https://abergeldie.com/?page_id=12370 Our projects Providing the Complex Infrastructure Needed to Build Better Communities featured projects Barwon Water Mains Renewal Program Abergeldie DKM has been working with Barwon Water to renew their water mains infrastructure over the last 7 years. The current contract has been held since 2021 and targets the replacement of reticulated water mains that pose…

The post Barwon Water Mains Renewal Program appeared first on Abergeldie Complex Infrastructure.

]]>

Our projects

Providing the Complex Infrastructure Needed to Build Better Communities

Barwon Water Mains Renewal Program

Abergeldie DKM has been working with Barwon Water to renew their water mains infrastructure over the last 7 years. The current contract has been held since 2021 and targets the replacement of reticulated water mains that pose a risk to customer supply.

Under the current contract, 14km of renewed pipelines have been installed within the Barwon Water service area which stretches over 8,100 square kilometres, from Little River and the Bellarine Peninsula in the east, to Colac in the west, and from Meredith and Cressy in the north, to Apollo Bay on Victoria’s south-west coast

The current program features 121 water renewal projects of varying complexities, classified as either short pipelines (<100m in length) or long pipelines (>100m in length). 

Client

Barwon Water

Year

In Progress

Region

VIC

Share

Projects of varying complexities
km
Renewed pipeline installed
Year client relationship
RELATED PROJECTS
Griffith Street Maddingley 2
Greater Western Water Main Renewals
YVW Photo 6 1200 x 900 px
Yarra Valley Water Mains Renewals
Balickera Tunnel Entrance
Balickera Tunnel Remediation
Cessnock WWTW Upgrade Project Aerial Photo
Cessnock Wastewater Treatment Works Upgrade
Caboolture South Recycled Water Disinfection Facility
Caboolture South Recycled Water Disinfection Facility

The post Barwon Water Mains Renewal Program appeared first on Abergeldie Complex Infrastructure.

]]>
Balickera Tunnel Remediation https://abergeldie.com/projects/balickera-tunnel-remediation/ Sun, 19 Mar 2023 23:24:44 +0000 https://abergeldie.com/?page_id=11927 OUR PROJECTS Providing the Complex Infrastructure Needed to Build Better Communities featured projects Balickera Tunnel Remediation Abergeldie was engaged by Hunter Water to carry out a remediation upgrade to the Balickera Tunnel. The tunnel is a key piece of the region’s water supply infrastructure and forms part of Balickera Canal which provides approximately 50% of…

The post Balickera Tunnel Remediation appeared first on Abergeldie Complex Infrastructure.

]]>

OUR PROJECTS

Providing the Complex Infrastructure Needed to Build Better Communities

Balickera Tunnel Remediation

Abergeldie was engaged by Hunter Water to carry out a remediation upgrade to the Balickera Tunnel. The tunnel is a key piece of the region’s water supply infrastructure and forms part of Balickera Canal which provides approximately 50% of the water yield from the Williams River to the Grahamstown Dam.

The remediation upgrade to Balickera Tunnel for Hunter Water was carried out over the Summer and Autumn seasons in 2021 – 2022 and now provides a further 100 years of design life to ensure the 1200m tunnel can continue to supply water from Williams River to Grahamstown Dam.

Client

Hunter Water

Year

2021-2022

Region

NSW

Share

m
Tunnel Length
m
Remediated/12hr Shift
yr
Design Life
RELATED PROJECTS
Cessnock WWTW Upgrade Project Aerial Photo
Cessnock Wastewater Treatment Works Upgrade
Caboolture South Recycled Water Disinfection Facility
Caboolture South Recycled Water Disinfection Facility
Clinker Place Stormwater Pipeline
Clinker Place Stormwater Pipeline
Luggage Point Sewage Treatment Plant
Luggage Point Sewage Treatment Plant Bioreactor Refurbishment
Brendale ATP Bypass
Brendale ATP Bypas

The post Balickera Tunnel Remediation appeared first on Abergeldie Complex Infrastructure.

]]>
Raising London Circuit https://abergeldie.com/projects/raising-london-circuit/ Fri, 24 Feb 2023 07:28:09 +0000 https://abergeldie.com/?page_id=12277 our Projects Providing the Complex Infrastructure Needed to Build Better Communities featured projects Raising London Circuit Abergeldie has been engaged by the ACT Government to deliver the Raising London Circuit Project. The project will help to better connect the City with the lake and make Canberra a more connected, sustainable and vibrant place to live.…

The post Raising London Circuit appeared first on Abergeldie Complex Infrastructure.

]]>

our Projects

Providing the Complex Infrastructure Needed to Build Better Communities

Raising London Circuit

Abergeldie has been engaged by the ACT Government to deliver the Raising London Circuit Project. The project will help to better connect the City with the lake and make Canberra a more connected, sustainable and vibrant place to live.

 

Client

ACT Government

Year

In progress

Region

ACT

Share

The project involves raising London Circuit by 6m to form an at-grade, signalised intersection with Commonwealth Avenue.

Key features of the project include:

  • Temporary closure of London Circuit between Edinburgh Avenue and Constitution Avenue;
  • Infilling the London Circuit Road reserve between Edinburgh Avenue and Constitution Avenue, to form embankments from the intersections with those roads to around the existing height of Commonwealth Avenue;
  • Removal of the existing ramps (cloverleaves) to the north-west and south-west of the London Circuit-Commonwealth Avenue interchange, and modification of the existing ramp to the south-east to remove connection with London Circuit and retain connection between Parkes Way and Commonwealth Avenue.
  • Staged closure and demolition of the northbound and southbound Commonwealth Avenue bridges over London Circuit, including infilling the London Circuit road reserve below.
  • Rebuilding London Circuit between Edinburgh Avenue and Commonwealth Avenue and Commonwealth Avenue and Constitution Avenue, including retaining walls;
  • Building a new signalised London Circuit-Commonwealth Avenue intersection, including capacity to accommodate proposed and potential future light rail infrastructure;
  • Provision of active transport infrastructure, utility connections, lighting, street furniture, landscaping and drainage;
  • Ancillary activities including construction compound sites, traffic diversions and traffic management measures; and
  • A temporary sidetrack constructed on part of the permanent embankment works to the east of the existing Commonwealth Avenue, to provide for continued traffic movements northbound and southbound for the duration of construction activities. The sidetrack and parts of the Commonwealth Avenue median would be temporarily paved to provide two traffic lanes, with connections to allow cross-over of traffic between the northbound and southbound traffic lanes and the sidetrack. The sidetrack would include temporary bicycle and pedestrian paths, allowing for safe diversion of pedestrians and cyclists during completion of the works.

 

Raising London Circuit Sustainability Policy

RELATED PROJECTS
Alfred Street Bridge Artists Impression
Alfred Street Bridge
Eastern Creek Roadworks
Eastern Creek Roadworks
Badgerys Creek new major roundabout2
Enablement works at Badgerys Creek Road and Aerotropolis
Vehicle driving on Vulture Street after completion of the signalised pedestrian crossing
Vulture Street, East Upgrade Signalised Pedestrian Crossing
Cars driving along Schofields Road
Schofields Road Upgrade

The post Raising London Circuit appeared first on Abergeldie Complex Infrastructure.

]]>
Waiau Street Stormwater Upgrade https://abergeldie.com/projects/waiau-street-stormwater-upgrade/ Wed, 15 Feb 2023 10:53:01 +0000 https://abergeldie.com/?page_id=12259 OUR PROJECTS Providing the Complex Infrastructure Needed to Build Better Communities featured projects Waiau Street Stormwater Upgrade Abergeldie, through the acquisition of Harker Underground, was engaged as a subcontractor to Hawkins Infrastructure, to deliver stormwater upgrade at Waiau Street Torbay as part of the Torbay Stormwater Upgrades/Renewals Project.    Client Auckland Council Year 2016 Region…

The post Waiau Street Stormwater Upgrade appeared first on Abergeldie Complex Infrastructure.

]]>

OUR PROJECTS

Providing the Complex Infrastructure Needed to Build Better Communities

Waiau Street Stormwater Upgrade

Abergeldie, through the acquisition of Harker Underground, was engaged as a subcontractor to Hawkins Infrastructure, to deliver stormwater upgrade at Waiau Street Torbay as part of the Torbay Stormwater Upgrades/Renewals Project. 

 

Client

Auckland Council

Year

2016

Region

NZ

Share

RELATED PROJECTS
Waiari-Abergeldie
Waiari Trunk Main Construction
Tunnels
Northern Corridor Improvements
Central Interceptor NZ
Central Interceptor Project
Fred Haigh Dam Remediation
Fred Haigh Dam Remediation
Maroochydore Sludge Thickening Upgrade Under Construction
Maroochydore Sludge Thickening Upgrade

The post Waiau Street Stormwater Upgrade appeared first on Abergeldie Complex Infrastructure.

]]>
Wynyard Quarter Wastewater Rising Main https://abergeldie.com/projects/wynyard-quarter-wastewater-rising-main/ Sun, 12 Feb 2023 16:55:39 +0000 https://abergeldie.com/?page_id=12249 OUR PROJECTS Providing the Complex Infrastructure Needed to Build Better Communities featured projects Wynyard Quarter Wastewater Rising Main Abergeldie, through the acquisition of Harker Underground was engaged as a subcontractor to Hawkins Infrastructure to deliver an upgrade to the Wastewater Rising Main along Halsey Street in Wynyard Quarter South. The upgrade was part of the…

The post Wynyard Quarter Wastewater Rising Main appeared first on Abergeldie Complex Infrastructure.

]]>

OUR PROJECTS

Providing the Complex Infrastructure Needed to Build Better Communities

Wynyard Quarter Wastewater Rising Main

Abergeldie, through the acquisition of Harker Underground was engaged as a subcontractor to Hawkins Infrastructure to deliver an upgrade to the Wastewater Rising Main along Halsey Street in Wynyard Quarter South. The upgrade was part of the ongoing redevelopment of the Wynyard Quarter which is expected to be complete in 2030. The upgrade to the rising main will help to support the increased population forecasted for the area.

Client

Auckland Transport

Year

2015 - 2018

Region

NZ

Share

RELATED PROJECTS
Waiari-Abergeldie
Waiari Trunk Main Construction
Tunnels
Northern Corridor Improvements
Central Interceptor NZ
Central Interceptor Project
Fred Haigh Dam Remediation
Fred Haigh Dam Remediation
Maroochydore Sludge Thickening Upgrade Under Construction
Maroochydore Sludge Thickening Upgrade

The post Wynyard Quarter Wastewater Rising Main appeared first on Abergeldie Complex Infrastructure.

]]>
Avon River Precinct Project https://abergeldie.com/projects/madden-to-pakenham-street-stormwater-upgrades-copy/ Tue, 07 Feb 2023 01:02:46 +0000 https://abergeldie.com/?page_id=12155 OUR PROJECTS Providing the Complex Infrastructure Needed to Build Better Communities featured projects Avon River Precinct Project Abergeldie delivered a series of works for the Avon River Precinct, a project that provided central Christchurch with a new civil waterfront space, connecting the Avon River via boardwalks and terracing with central city areas to enhance local…

The post Avon River Precinct Project appeared first on Abergeldie Complex Infrastructure.

]]>

OUR PROJECTS

Providing the Complex Infrastructure Needed to Build Better Communities

Avon River Precinct Project

Abergeldie delivered a series of works for the Avon River Precinct, a project that provided central Christchurch with a new civil waterfront space, connecting the Avon River via boardwalks and terracing with central city areas to enhance local recreation, tourism and business growth.

 

Client

Auckland Transport

Year

2017-2018

Region

NZ

Share

RELATED PROJECTS
Waiari-Abergeldie
Waiari Trunk Main Construction
Tunnels
Northern Corridor Improvements
Central Interceptor NZ
Central Interceptor Project
Fred Haigh Dam Remediation
Fred Haigh Dam Remediation
Maroochydore Sludge Thickening Upgrade Under Construction
Maroochydore Sludge Thickening Upgrade

The post Avon River Precinct Project appeared first on Abergeldie Complex Infrastructure.

]]>
City Rail Link C2- Enabling Works Contract https://abergeldie.com/projects/city-rail-link-c2-enabling-works/ Wed, 25 Jan 2023 01:56:50 +0000 https://abergeldie.com/?page_id=12160 OUR PROJECTS Providing the Complex Infrastructure Needed to Build Better Communities featured projects City Rail Link C2- Enabling Works Contract Abergeldie, through the acquisition of Harker were engaged as part of the Connectus Joint Venture to deliver the enabling works Auckland's first underground rail link under City Rail Link Contract 2. The works involved pipe…

The post City Rail Link C2- Enabling Works Contract appeared first on Abergeldie Complex Infrastructure.

]]>

OUR PROJECTS

Providing the Complex Infrastructure Needed to Build Better Communities

City Rail Link C2- Enabling Works Contract

Abergeldie, through the acquisition of Harker were engaged as part of the Connectus Joint Venture to deliver the enabling works Auckland's first underground rail link under City Rail Link Contract 2.

The works involved pipe jacking a new stormwater pipe from Swanson to Wellesley Street, strengthening the Orakei main sewer and construction of the new cut and cover tunnels up Albert Street, from Customs Street to Wyndham Street.

 

 

Client

Auckland Transport

Year

2015-2016

Region

NZ

Share

RELATED PROJECTS
Waiari-Abergeldie
Waiari Trunk Main Construction
Tunnels
Northern Corridor Improvements
Central Interceptor NZ
Central Interceptor Project
Fred Haigh Dam Remediation
Fred Haigh Dam Remediation
Maroochydore Sludge Thickening Upgrade Under Construction
Maroochydore Sludge Thickening Upgrade

The post City Rail Link C2- Enabling Works Contract appeared first on Abergeldie Complex Infrastructure.

]]>