Kalkallo Creek Trunk Sewer Main Stage 1
Abergeldie, was engaged to design and construct the trenchless portions of Stage 1 of the new Kalkalo Creek Main Sewer (KCMS) is part of the Kalkallo Sewer Servicing Strategy for the Northern Growth Corridor. The total length of the proposed sewer is over 13km comprising of three stages of which Stage 1 is approximately 3.4km long.
Client
Yarra Valley Water
Year
2019
Region
VIC
m
GRP Pipe Installed (ID1388)
m