North Goonyella Ventilation Shaft No 4
Due to our success in completing works at North Goonyella Ventilation Shaft No. 4, Abergeldie was engaged to bore and line the mine’s Ventilation Shaft No.
The Shaft was bored from surface to 84m depth at 6.8m diameter and steel lined through Tertiary strata. Then remainder of the shaft was completed at 6.15m diameter to coal seam level at 272m total depth.
Client
Peabody North Goonyella Coal Mines
Year
2007
Region
QLD
m
Total Drilled Depth
m
Diameter
Steel Lined Section (84m deep)
m
Diameter