Our projects

Providing the Complex Infrastructure Needed to Build Better Communities

Yarra Valley Water Sewer Mains Renewals Program

Abergeldie and Yarra Valley Water are working together to ensure reliability of water supply in Melbourne through the ongoing Sewer Mains Renewals Program. Abergeldie is engaged to complete investigation, design, and construction of the rehabilitation of sewers ranging in diameter from 100mm to 900mm through various rehabilitation methodsThe program also involves the rehabilitation of property connection sewers and civil spot repairs. 

Client

Yarra Valley Water

Year

In Progress

Region

VIC

Share

mm
Range in liner Diameters
m
Range in Liner Depths
Year Client Relationship

2021

16683.52m in length so far

2020

28105.75m in total length

2019

33935.09m in total length

2018

33038.15m in total length

2017

32286.6m in total length

2016

8163.47m in total length

RELATED PROJECTS
Griffith Street Maddingley 2
Greater Western Water Main Renewals
YVW Photo 6 1200 x 900 px
Yarra Valley Water Mains Renewals
Downes Lane, Geelong_1200 x 900
Barwon Water Mains Renewal Program
Balickera Tunnel Entrance
Balickera Tunnel Remediation
Cessnock WWTW Upgrade Project Aerial Photo
Cessnock Wastewater Treatment Works Upgrade